Independent quote review · United Kingdom

Before you accept a builder’s quote, get it checked.

Independent quote reviews by experienced construction professionals — helping UK homeowners spot overpricing, vague allowances, missing scope and potential risks before committing to a builder.

Independent quote checks. No builder referrals. No sales agenda.

Typical turnaround: within 2 working days.

Service
Document review
Coverage
United Kingdom
Turnaround
Usually 2 working days after payment and document confirmation
Fee
£99 flat
The problem

A cheaper quote is not always a better quote.

Two builders can price the same project very differently, but the difference is not always profit. Sometimes one quote includes more detail, clearer allowances, better specification, or fewer hidden assumptions.

BuildFairUK helps you understand what is actually included before you accept.

What we check

A structured review of the things that quietly cost homeowners the most.

  • Missing or unclear scope
  • Vague wording
  • Exclusions
  • Provisional sums
  • PC sums
  • VAT clarity
  • Payment schedule
  • Labour and material detail
  • Building control assumptions
  • Waste removal
  • Access issues
  • Pricing concerns
  • Questions to ask before accepting
  • Programme and timescale assumptions
Process

How it works

1

Share your documents

Send us your builder's quote, along with any drawings or plans you have.

2

We review the detail

Our team examines the quote for missing scope, unclear wording, risky allowances and points worth clarifying.

3

You receive a clear report

You get a plain-English PDF setting out our findings and the questions to raise before you proceed.

See an example

Preview a sample Independent Quote Review

Before submitting your builder’s quote, you can view an example BuildFairUK report to understand the style, structure and level of detail you’ll receive.

The sample report shows how we highlight unclear wording, missing items, provisional sums, pricing considerations and practical questions to raise before committing.

Example finding · 1 of 14
Red flag
“Allow £4,500 for kitchen — final to be agreed with supplier.”Extract from builder’s quote — item 7.2
Reviewer comment

This is a provisional sum, not a fixed price. A £4,500 allowance is low for a supplied-and-fitted kitchen and is likely to increase once the supplier is chosen. The quote does not specify worktop type, appliance allowance, or who is responsible for plumbing and electrical connections.

Scope concerns
  • • Worktop material and edge profile not stated
  • • Appliance package — integrated vs freestanding
  • • 1st and 2nd fix plumbing & electrical connections
  • • Removal and disposal of existing kitchen
Question to put to your builder

“Can the kitchen allowance be replaced with a fixed price once the supplier is chosen, and confirm exactly what’s included?”

Sample report is anonymised and for illustration only.

Independent Quote Review · BuildFairUK
£99flat fee

A plain-English review of your builder’s quote before you commit.

Includes
  • Quote completeness review
  • Missing or unclear item list
  • Risk observations
  • Pricing comments
  • Questions to ask your builder
  • Plain-English PDF report
Upload Your Quote

Payment requested only after we confirm we can review your documents.

FAQ

Common questions

Get a second pair of eyes — before you sign.

Independent quote checks. No builder referrals. No sales agenda. £99 flat fee.

Typical turnaround: within 2 working days.